Card deck shipping splits into three modes: express for samples and small parcels in 3–7 days, air freight for 100kg to 1 tonne in 5–10 days, and sea freight above 1 tonne in 25–40 days. Choose on landed cost and launch date, then pack to survive the weakest link.
The three modes, compared honestly
| Express | Air freight | Sea freight | |
|---|---|---|---|
| Transit | 3–7 days | 5–10 days | 25–40 days |
| Best weight | Under 100 kg | 100 kg – 1 t | Above 1 t |
| Relative cost | Highest per kg | Medium | Lowest per kg |
| Customs | Usually included | Broker needed | Broker needed |
| Risk | Low handling damage | Moderate | Humidity, stacking, delays |
A 500-deck order usually weighs 90–140kg depending on stock and box. That sits exactly on the line between express and air, which is why the same order is quoted both ways.
When express is the right answer
Use express for samples, replacement decks, and launch inventory that must arrive before a fixed event. The per-kilo cost is high, but the door-to-door service includes pickup, export clearance and delivery, which removes three handoffs where paperwork can stall.
Express has two limits worth knowing. Cartons above 30kg are often repacked or surcharged, so keep each carton under 25kg. And express does not solve a customs classification problem, so the invoice description still has to be accurate.
Air freight: the middle ground
Air freight charges on chargeable weight, which is volume divided by 6,000 for most carriers. Card decks are dense, so chargeable weight is usually close to actual weight, which makes air more attractive than it is for bulky goods. From 100kg to about 1 tonne, air is often the best balance of cost and certainty.
You need a broker at the destination for clearance, and the document set must match the goods exactly: commercial invoice, packing list, and the HS code for printed matter or playing cards depending on the product.
Sea freight: cost per deck, and the risks
Above 1 tonne, sea freight is the only sane choice. The saving is 60–70% against air, and the trade is time plus two physical risks: container humidity and pallet stacking pressure. A 40HQ container can swing 15°C in a day, and paper decks absorb moisture at the cut edge.
Mitigations that work: shrink-wrapped decks inside a poly-lined carton, desiccant bags per carton for long routes, corner protectors on every carton, and a pallet pattern that keeps cartons from overhanging the pallet edge. Overhang is the single most common cause of crushed corners.
Packing rules that prevent claims
- Use a carton rated for the stacked weight, not just for the deck.
- Keep cartons under 25kg so they can be handled without dragging.
- Put a divider between shrink-wrapped decks and the carton wall.
- Label the carton with SKU, quantity and a barcode on two faces.
- Photograph the pallet before stretch wrapping; it is the evidence if a claim is filed.
Documents and terms
The standard set is commercial invoice, packing list, bill of lading or air waybill, and a certificate of origin where the destination requires one. If the decks use FSC-certified stock and your buyer has a policy, add the FSC claim on the invoice and keep the chain-of-custody certificate on file.
Incoterms decide who pays for what. FOB is common for factory orders: we deliver to the port and you control the main freight. CIF puts the booking in our hands and is easier for first-time buyers. DDP is convenient but shifts duty risk to the seller, and many factories price it conservatively.
Planning card deck shipping backwards from the launch date
Card deck shipping is the last step and the first thing that should be planned. Work back from the date the deck must be on a shelf, and each mode narrows the production window you have left.
For a sea shipment, add 25–40 days transit, 7–10 days for booking and port handling, and 3–5 days for import clearance. That is roughly six weeks after the cartons leave the factory. If production takes 20 days, the artwork has to be approved eight weeks before the launch.
For air, the same calculation is 5–10 days transit plus 3–5 days for clearance and inland delivery. For express, 3–7 days door to door with clearance usually included. Each step up in speed costs more per kilo and buys back calendar time that cannot be recovered later.
- Book the vessel or flight before the packing date, not after; space is the constraint in peak season.
- Keep 5 days of slack between the factory handover and the carrier cut-off.
- Send the invoice and packing list to the broker 48 hours before departure.
- Photograph the pallet and the container seal; both are evidence if a claim is filed.
The same logic applies to samples. A sample sent by express on a Friday often clears customs on Monday, so a sample approved on a Monday can start production the same week. Our shipping policy sets out the modes and terms we quote; MOQ and lead times covers the production side of the same calendar.
Damage claims: what to photograph
Most claims fail on evidence, not on merit. Photograph the pallet before stretch wrapping, the carton corner after opening, and the damaged deck next to the carton label. Carriers ask for the label and the damage in the same frame because it proves the carton was the one they carried.
Record the count. A claim for 40 crushed decks in a 500-deck shipment needs the carton number, the quantity per carton and the total affected. Without the count, the carrier settles a fraction or asks for a survey that costs more than the goods.
If the cause is humidity rather than handling, the evidence looks different: wavy edges, a musty smell, and a moisture indicator strip that has changed colour. Photograph the desiccant and the container number; humidity claims are usually settled against the carrier or the insurer, not the factory.
Export documents are part of the same record. Keep the commercial invoice, packing list and bill of lading together, because the customs description must match what the cartons actually contain. For paper-based products, the FSC claim on the invoice is checked against the certificate on file, so a mismatch can hold a shipment at the port.
Choosing between FOB, CIF and DDP
The Incoterm decides who books the freight, who insures the goods and who clears customs. FOB gives the buyer control and the lowest headline price, because the factory delivers to the port and stops there. CIF is easier for a first order: the factory books the vessel and the insurance, and the buyer still clears customs at destination.
DDP looks simplest and is usually the most expensive, because the seller carries the duty risk and prices it conservatively. It suits a buyer with no importer of record, and it is a poor fit for a buyer who already has a broker and a duty rate.
Whichever term you choose, write it on the invoice and match it to what the forwarder booked. A shipment quoted FOB but handed to a CIF booking ends up with two freight charges and an argument about who pays the second one.
FAQ
How much does it cost to ship 500 decks?
It depends on weight, destination and mode. A 500-deck order weighs roughly 90–140kg; express is quoted per kilo with a minimum charge, air is priced on chargeable weight, and sea is quoted per cubic metre with a minimum.
Can you ship to Amazon FBA?
Yes, with the FBA requirements applied at packing: carton weight limits, FNSKU labels, and a packing list per carton. Send us the FBA shipment plan before we label the cartons.
Who handles customs?
For FOB and CIF shipments, the importer clears customs with a broker at destination. We provide the invoice, packing list and certificate of origin; duties and import VAT are the buyer's responsibility unless the terms say otherwise.